Two-week plan:
- Days 1-2: Narrative, sitemap, and section map.
- Days 3-5: Copy + wireframes, lock visual direction.
- Days 6-9: Build + content wire-in, light interactions.
- Days 10-12: QA, performance pass, handoff checklist.
How we sequence discovery, design, build, and QA to hit a fixed date.
September 18, 2024
Two-week plan:
Next steps
Need this implemented on your site?
We can ship the starter, tailor it, or run an enablement sprint.
More posts
Keep markdown, links, and images clean with a lightweight linting stack before every deploy.
A light playbook for shipping personalization on static-first stacks using edge functions and smart defaults.
Schema, fast pages, and predictable metadata keep organic acquisition healthy even as you swap backends.
How we keep marketing pages moving fast with markdown collections, guardrails, and a tight PR process.
Shape complex features into a simple sequence: orient, prove, convert.
A repeatable list we run before shipping: content, performance, analytics, and rollbacks.